· by Michael Blair, Nashville's Contractor
A detached garage or a workshop looks like the simplest thing to build on a property: a slab, four walls and a roof. The permit side is where people get caught, because it is not treated like the house.
Metro Nashville’s explainer on the zoning code draws the line in one sentence: zoning tells you what you can build on a piece of property, and the building code tells you how. For an outbuilding, zoning decides where it can sit and how big and tall it can be, and the rooms and fixtures you put inside decide whether it is still an accessory building at all. We build detached garages and workshops across Middle Tennessee, and sorting this out before the plans are drawn is cheaper than redrawing them.
Does zoning apply to a detached garage?
An accessory building falls under the zoning for the lot. In Davidson County, Metro’s accessory structure permitting instructions say a zoning examiner reviews the application and plans for use, setback, footprint and height, based on the parcel’s zoning, as part of the building permit at Metro Codes. On lots under 40,000 square feet, a building behind the house is held to 700 square feet or half the footprint of the house, whichever is greater, never more than 2,500 square feet, and every detached accessory structure on the lot counts toward that total.
Height on those lots stops at one story or 16 feet; on lots of 40,000 square feet or more, a building behind the house can reach two stories or 24 feet if it keeps the district’s full side and rear setbacks. Outside Davidson County the rules come from whichever city or county has the parcel, and we read that jurisdiction’s own code rather than assume Metro’s numbers carry over.
How close to the property line can a detached garage sit?
A detached garage’s distance from the property lines depends on its size and where it sits on the lot, and the setbacks are where the survey earns its keep. Metro gives one accessory building of 700 square feet or less, sitting behind the house, a side setback of half the district’s requirement but never under three feet, and a rear setback of three feet, which grows to ten when the garage doors open onto an alley. A larger building, a second outbuilding, or anything beside or in front of the house takes the full district setbacks.
Nothing goes over a platted setback, a corner lot’s side street setback or a utility easement, and since Metro Codes keeps no easement records, the plat, a title abstract, a survey and the utility companies are where those turn up. In a historic or neighborhood conservation overlay the Historical Commission enforces setbacks, footprint and height instead, and a historic permit is needed on top of the building permit. If the lot sits under recorded subdivision covenants or a homeowners association, we read those too, because they are a separate rulebook from the zoning code.
What does a garage building permit cover?
Once zoning allows the building, the permit covers the structure. Metro’s residential building permit page names garages, carports and storage buildings among the accessory structures that need one, asks for a site plan with distances to the property lines, and requires elevation drawings showing the height of a detached accessory structure; the accessory instructions add a floor plan with every proposed fixture and appliance on it. Inspectors check the work in the field against the building, electrical, plumbing, energy and gas and mechanical codes.
Metro’s list does not call for engineered drawings on a garage, though the codes office may ask for them on a post-frame building or a long clear span, and we have those engineered regardless; our post on when a barn becomes a house explains what post-frame involves. Power to the building is its own paperwork. Metro’s building permit process page says electrical, plumbing, gas and mechanical, and low voltage work each need separate permits and inspections, obtained by a licensed subcontractor after the building permit is issued.
- Setbacks from every property line, and whether the building qualifies for the reduced ones
- Height, which Metro holds to one story or 16 feet on lots under 40,000 square feet
- Easements on the plat, the title work or the survey that cannot be built over
- Elevation drawings showing the height, and engineered drawings where the frame calls for them
- A separate electrical permit and inspection for the wiring
Can the homeowner pull the permit for a detached garage?
An owner who lives in the house can pull a self-permit for a detached garage in Davidson County, and Metro’s residential page is plain that the owner then carries responsibility for meeting the zoning, building and trades codes. The trade permits work differently: according to Metro’s trades permits page, only licensed contractors with an e-permit account can apply online, and anyone else applies in person at the Codes department.
Metro also recommends calling Metro Stormwater any time the footprint on a parcel grows, and the ground under the slab can be a question of its own, which our post on site grading plans in Nashville works through. Outside Davidson County the reliable answer comes from the building office for that parcel, asked with a sketch of what you intend to build and where.
What plumbing and rooms can a detached garage have?
Metro is specific about what can go inside. Its accessory structure instructions allow one toilet, one hand sink, one bar sink and one utility or slop sink, no more than one of each, and a shower only in a pool house on a lot with a permitted pool. Bedrooms, dwelling space and kitchens are ruled out. So a shop with a half bath and a utility sink can still be a garage, and a shop with a bedroom or a kitchen cannot.
The practical rule is to be straight about the intended use at the permit stage. A building permitted as a garage and later finished as a guest suite becomes exactly the dwelling space Metro’s accessory rules prohibit, while the permit on file still calls it a garage.
When can a garage or workshop hold a second dwelling?
A garage or workshop can hold a second dwelling only as a detached accessory dwelling unit, which is a different permit altogether. According to Metro’s page on detached accessory dwelling units, a DADU can sit above a garage or be attached to a workshop, but only where the zoning district permits one with conditions and the parcel is in the Urban Services District or an overlay or plan that provides for them, with one per parcel, a single house on the lot, and one of the two dwellings lived in by the owner. Its living space tops out at 700 square feet on lots under 10,000 square feet and 850 on larger ones.
If living space is a real possibility, find out first whether the parcel can have a DADU at all, then design and permit for it now, or at least rough in what would be hard to add later. Metro does not let a property owner pull a self-permit for a DADU, so that application comes from a registered contractor, and once a DADU is on the lot, no other accessory structure there can exceed 200 square feet, which matters if the shop is meant to come second.
Can a garage or shop on a septic system have plumbing?
On a property with a septic system, adding plumbing to an outbuilding means the waste has to go somewhere the system was approved to take it. Tennessee’s subsurface sewage disposal rule, 0400-48-01, sizes a home’s septic tank by bedroom count, from 750 gallons for two bedrooms or fewer to 1,000 gallons for four, plus 250 gallons for each bedroom past that, and its permit fees cover modifying or expanding an existing system when an addition brings added wastewater flow.
TDEC’s septic system construction permit page sends applications to the Division of Water Resources at the appropriate Environmental Field Office, where review generally takes 10 days and has to be completed within 45. In Davidson County, Metro’s residential permit page says the Metropolitan Health Department has to approve any permit on a property served by a septic system before it is issued. Whether the existing system can take the new fixtures is for that review to decide, so we have the answer before the plumbing is drawn.
How do power and water reach a detached shop on rural land?
Power and water to a detached shop are simpler than septic but carry distance. We size the wire for the length of the run and the equipment going into the shop, and when the building sits far enough out that its own meter might make sense, we raise that with the electric utility or cooperative before the trench is dug. Water lines go in deep enough to stay clear of freezing, at whatever depth the local code sets, and where limestone sits close to the surface we plan extra days for that trench.
Metro’s accessory instructions also say to contact Tennessee 811 at least three working days before a project starts, so the buried utilities are marked first. None of it decides whether the project is worth doing; it decides the budget and the order of work, and when you ask us for an estimate, the parcel address and a sketch of what you want are enough to start.
Sources
- Metro Nashville Codes and Building Safety: Accessory Structure Permitting Instructions — Zoning review of use, setback, footprint and height; the 700 and 2,500 square foot floor area limits; height limits by lot size; reduced and full setbacks; no building over setbacks or utility easements; no easement records kept; historic overlays; the fixture limit, no bedrooms, dwelling space or kitchens, and the pool house shower; Metro Stormwater and Tennessee 811.
- Metro Nashville Codes: Build a Detached Accessory Dwelling Unit (DADU) — DADU eligibility, one per parcel, owner occupancy, a unit above a garage, the 700 and 850 square foot living space caps, and the 200 square foot limit on other accessory structures.
- Metro Nashville Codes: Residential Building Permits — Permits for accessory structures including garages; site plan and elevation drawings; field inspections by code; self-permits and owner responsibility; no self-permit for a DADU; Metropolitan Health Department approval on septic properties.
- Metro Nashville Codes: Building Permit Process — Separate permits and inspections for electrical, plumbing, gas and mechanical, and low voltage work, obtained by a licensed subcontractor after the building permit.
- Metro Nashville Codes: Trades Permits — Only licensed contractors with an e-permit account apply online; others apply at the department.
- Metro Nashville Codes: Understanding the Zoning Code — Zoning sets what can be built on a property; the building code sets how.
- TDEC Division of Water Resources: Septic System Construction Permit — Applications to the Environmental Field Office; bedroom count on the application; review generally 10 days and within 45.
- Tennessee Rule 0400-48-01, Regulations to Govern Subsurface Sewage Disposal Systems (April 2014 revision) — Septic tank capacity by bedroom count; permits for modifying or expanding a system because of additions that add wastewater flow.
FAQ
Permits for a Detached Garage or Workshop — questions
Do I need a permit to build a detached garage in Nashville?
In Davidson County, yes. Metro Codes requires a building permit for a new accessory structure, garages included, with a zoning review of setbacks, footprint and height and elevation drawings showing how tall it will be. Wiring takes a separate electrical permit and inspection. Outside Davidson County, check with the city or county building office for that parcel.
Can I put a bathroom in a detached shop?
In Davidson County, a half bath, yes. Metro allows one toilet, one hand sink, one bar sink and one utility sink in an accessory structure, but no bedrooms, dwelling space or kitchens, and a shower only in a pool house with a permitted pool. The plumbing takes its own trade permit, and on septic the added flow needs approval first, from the Metropolitan Health Department in Davidson County or from TDEC’s Division of Water Resources through its field offices elsewhere.
How close to the property line can I build a detached garage?
In Davidson County, one garage of 700 square feet or less behind the house can take a side setback of half the district’s, but not under three feet, and a rear setback of three feet, or ten where garage doors open onto an alley. Larger buildings, or ones beside or in front of the house, need the full district setbacks, and none can go over a platted setback or a utility easement. Elsewhere, check the zoning office for that parcel and the easements on your survey.
Is a detached garage considered a dwelling?
Not in Davidson County while it stays an accessory building. Metro’s accessory rules exclude bedrooms, kitchens and dwelling space, though one toilet, one hand sink and one utility sink are allowed. Living space in or over a garage makes it a detached accessory dwelling unit, which needs its own permit, a qualifying parcel and a registered contractor.